The Planning Inspectorate

Regional Spatial Strategy

Overview

Thurrock/Lakeside Basin Examination in Public (EiP)

Welcome
News
Timetable/Programme
Meetings and Minutes
Representations
Participant's Statements
Document Centre
Contact Details
Links

Site Settings

You are currently viewing information for England.

View information for Wales

Modified: 02 March 2009

Thurrock/Lakeside Basin Examination in Public (EiP)

The EiP Panel Report was submitted to the Secretary of State and is available for download on the Government Office for the East of England’s website:

View the Panel Report


 

The EiP is now closed and no further communication will be accepted by the Panel.
All queries relating to the Thurrock / Lakeside Basin Single Issue Review should now be directed to the GO-East Office in Cambridge.

Matters and Provisional Agenda Questions, Updated Draft List of Documents and Written Statements added on Thursday 16th July.

Agenda Questions icon 75kb

An updated Draft List of the Examination Library Documents - mid July is now available in the Document Centre.

Written Statements are now available in the Participants Statements area.


 

One document on Retail Need / Impact together with 9 Appendices added to the Document Centre on Saturday 4th July 09.

Draft Statement on Retail Need / Impact icon 113kb

Appendices 1 to 9

Two new documents on Retail Issues added to the Document Centre on Thursday 25th June 09.

Retail Impact Issuesicon 38kb

Retail Need Issues icon 53kb


 

The Final Programme is now available.

Final Programmeicon 106kb

Please submit electronic and paper copies of written statements on the Matters contained in the Final Programme to the Panel Secretary at the Panel Secretariat Office by 5.00pm on Friday 10th July 2009.

A Draft List of the Examination Library Documents is now available in the Document Centre.


 

The Note of the Technical Meeting is available.

Note of Technical Meeting icon 2.10Mb

The Note of the Preliminary Meeting is available.

Note of Preliminary Meeting icon 114kb

The Proposed Timetable, Preliminary List of Matters and Participants of the East of England Plan Regional Spatial Strategy Policy ETG2: Thurrock Key Centre for Development and Change – Lakeside Basin Single Issue Review Examination in Public (EiP), together with the Notes for Participants and the Notice, have now been published by the Panel.

Please submit any written comments on the Preliminary List of Matters and Participants to the Panel Secretary at the Panel Secretariat Office by 5.00pm on Friday 12 June 2009.

Draft Provisional Programmeicon 109kb

Notes for Participantsicon 555kb

Notice icon 35kb

Agenda for the Preliminary Meeting is available.

Agenda for Preliminary Meeting icon 26kb

Additionally available is the draft of the Panel Tours.

Panel Tours icon 21kb

Previously published documents

The Panel has published four Panel Information Notes and other Notes and EiP documents will follow in due course. These will provide information on the EiP process and procedures.

The overall examination timetable is outlined in Note A.  The strategic approach is the focus of Note B. While Note C sets out the purpose of the EiP, identifies potential issues arising from the Secretary of States Policy, sets out the role of potential participants and invites expressions of interest. Note D outlines the purpose of the Technical Meeting, which is to assist the Panel’s and Participants’ understanding of the technical work undertaken in connection with the review.

Panel Information Note A icon 26kb

Panel Information Note B icon 34kb

Panel Information Note C icon 67kb

Panel Information Note D icon 30kb

The Deposit Draft and other submitted documents can be found on the East of England Regional Assembly and the GO-East websites.

 


How to view PDF documents

PDF files can be viewed using Adobe's Acrobat Reader. You can download Acrobat Reader free of charge from the Adobe website. Visit Access Adobe to find out how people with visual disabilities can get the most from this software.

Get Acrobat Reader